Hydro Excavation
Non-destructive digging that exposes a live line without touching it. Water cuts the soil, vacuum lifts it, and nothing mechanical ever reaches the utility.
Greenville and Spartanburg Counties
Manufacturing, an international airport and an inland port, all on the same stretch of I-85.
Protect What's Below.
Greer carries more concentrated industrial infrastructure than anywhere else in the Upstate. BMW's Plant Spartanburg, GSP International Airport and the South Carolina Inland Port all sit inside a few miles of each other, and the supplier parks fill the ground between them.
That kind of site has three things in common wherever it is: enormous quantities of private utility that no public locate covers, operations that cannot be shut down while somebody investigates, and a strike cost measured in production rather than repair.
It is the environment where non-destructive excavation stops being the careful option and starts being the only one anybody will permit.
Work that has to happen around running operations, where the truck stays outside and the hose reaches in.
Campus power, process water, gas runs and fiber between buildings — all of it the owner's, none of it marked by 811.
Secure, paved, heavily serviced, and unforgiving of an open trench left overnight.
Non-destructive digging that exposes a live line without touching it. Water cuts the soil, vacuum lifts it, and nothing mechanical ever reaches the utility.
A small hole, straight down to the line, so you have its real depth and offset on paper before a crew commits to anything.
A narrow vacuum-cut trench for conduit, cable or small-diameter pipe — a fraction of the surface damage an open cut leaves behind.
High-pressure jetting with vacuum recovery — the blockage comes out of the pipe and leaves on the truck, not into the next structure downstream.
GPR, electromagnetic locating and camera-and-sonde work on the private lines past the meter — the ones 811 does not come out for.
Common questions
Based in Upstate South Carolina, working across North and South Carolina. If you are not sure whether your site is in range, call — distance is a scheduling question rather than a yes or no.
Because 811 marks utility-owned lines, generally up to the meter or demarcation point, and nothing beyond it. Site lighting, irrigation, the feed to a pump house, gas to a generator, the sewer lateral, fiber between two buildings on one campus — all of it belongs to the property owner, and no public locator is coming out for any of it. On commercial, industrial and institutional ground that is most of what is in the way.
A locate tells you a line is somewhere under a painted mark, within a tolerance. A pothole is a small excavation that exposes the line so you can measure its actual depth, offset, size and condition. One is an estimate from the surface; the other is a measurement of the thing itself. Design work and bore clearance generally need the second.
That depends on where the work is, what it involves, and what is already scheduled — so rather than publish a number we cannot honor on every job, call and you will get a straight answer about this week.
Tell us where it is and what is in the way.