Hydro Excavation
Non-destructive digging that exposes a live line without touching it. Water cuts the soil, vacuum lifts it, and nothing mechanical ever reaches the utility.
Greenville County
A downtown rebuilt on top of its own century-old utility corridors, and a county adding more line every year.
Protect What's Below.
Greenville is the hardest kind of ground to dig in for a reason that has nothing to do with soil: almost everything worth working on downtown has had four or five generations of utility laid through it, and the drawings do not agree with each other.
Main Street, the West End, Unity Park and the corridors between them carry water, sewer, storm, gas, power, and communications in rights-of-way that were never designed to hold all six. Add a decade of redevelopment on top and you have the exact condition hydro excavation exists for — a place where you cannot put a bucket in the ground and find out afterwards.
Outside the core, the county is building fast on Piedmont clay, which is stiff, sticky, and slow to move mechanically. Water cuts it without fighting it.
Where six utilities share a corridor and no single as-built is authoritative, potholing before the design is finished is cheaper than resolving the conflict in a trench.
Brick, streetscape, plaza, and new pavement. A slot trench and a patch cost a fraction of a saw cut and a repair.
Saprolite is hard on mechanical excavation and hard on schedules. It does not resist water the same way.
Non-destructive digging that exposes a live line without touching it. Water cuts the soil, vacuum lifts it, and nothing mechanical ever reaches the utility.
A small hole, straight down to the line, so you have its real depth and offset on paper before a crew commits to anything.
A narrow vacuum-cut trench for conduit, cable or small-diameter pipe — a fraction of the surface damage an open cut leaves behind.
High-pressure jetting with vacuum recovery — the blockage comes out of the pipe and leaves on the truck, not into the next structure downstream.
GPR, electromagnetic locating and camera-and-sonde work on the private lines past the meter — the ones 811 does not come out for.
Common questions
Based in Upstate South Carolina, working across North and South Carolina. If you are not sure whether your site is in range, call — distance is a scheduling question rather than a yes or no.
Because 811 marks utility-owned lines, generally up to the meter or demarcation point, and nothing beyond it. Site lighting, irrigation, the feed to a pump house, gas to a generator, the sewer lateral, fiber between two buildings on one campus — all of it belongs to the property owner, and no public locator is coming out for any of it. On commercial, industrial and institutional ground that is most of what is in the way.
A locate tells you a line is somewhere under a painted mark, within a tolerance. A pothole is a small excavation that exposes the line so you can measure its actual depth, offset, size and condition. One is an estimate from the surface; the other is a measurement of the thing itself. Design work and bore clearance generally need the second.
That depends on where the work is, what it involves, and what is already scheduled — so rather than publish a number we cannot honor on every job, call and you will get a straight answer about this week.
Tell us where it is and what is in the way.