Hydro Excavation
Non-destructive digging that exposes a live line without touching it. Water cuts the soil, vacuum lifts it, and nothing mechanical ever reaches the utility.
Pickens County
Fast residential growth along US-123, on some of the stiffest clay in the Upstate.
Protect What's Below.
Easley has grown quickly along the US-123 corridor, and growth of that shape produces a predictable sequence: new service extended to new development, new storm systems installed and immediately silted up by the site work around them, and new line crossing old line that nobody has a complete record of.
Pickens County clay is as stiff as anywhere in the Upstate. It is slow ground for mechanical excavation and it limits how deep ground-penetrating radar usefully reads, which is exactly the case for exposing a line rather than estimating where it is.
Extensions that have to cross whatever is already in the right-of-way, with as-builts of uneven quality.
New drainage that needs cleaning out before turnover, not after the first storm shows it is blocked.
Hard on buckets, hard on schedules, and a limit on what GPR alone can tell you.
Non-destructive digging that exposes a live line without touching it. Water cuts the soil, vacuum lifts it, and nothing mechanical ever reaches the utility.
A small hole, straight down to the line, so you have its real depth and offset on paper before a crew commits to anything.
A narrow vacuum-cut trench for conduit, cable or small-diameter pipe — a fraction of the surface damage an open cut leaves behind.
High-pressure jetting with vacuum recovery — the blockage comes out of the pipe and leaves on the truck, not into the next structure downstream.
GPR, electromagnetic locating and camera-and-sonde work on the private lines past the meter — the ones 811 does not come out for.
Common questions
Based in Upstate South Carolina, working across North and South Carolina. If you are not sure whether your site is in range, call — distance is a scheduling question rather than a yes or no.
Because 811 marks utility-owned lines, generally up to the meter or demarcation point, and nothing beyond it. Site lighting, irrigation, the feed to a pump house, gas to a generator, the sewer lateral, fiber between two buildings on one campus — all of it belongs to the property owner, and no public locator is coming out for any of it. On commercial, industrial and institutional ground that is most of what is in the way.
A locate tells you a line is somewhere under a painted mark, within a tolerance. A pothole is a small excavation that exposes the line so you can measure its actual depth, offset, size and condition. One is an estimate from the surface; the other is a measurement of the thing itself. Design work and bore clearance generally need the second.
That depends on where the work is, what it involves, and what is already scheduled — so rather than publish a number we cannot honor on every job, call and you will get a straight answer about this week.
Tell us where it is and what is in the way.