Hydro Excavation
Non-destructive digging that exposes a live line without touching it. Water cuts the soil, vacuum lifts it, and nothing mechanical ever reaches the utility.
Service
Find out what is down there before the design is finished.
Protect What's Below.
Potholing — daylighting, test-holing, vacuum excavation, depending on who you learned it from — is a small excavation made for one reason: to put eyes on a buried utility and record exactly where it is.
An 811 locate tells you a line is somewhere under a painted mark. It does not tell you how deep, how far off the paint it actually sits, what size it is, what it is made of, or what condition its coating is in. Every one of those decides whether a bore clears it, whether a proposed storm line conflicts with it, and whether the crew arriving on Monday has a problem nobody has priced.
A pothole answers it in an hour, before the answer costs anything. A strike answers it too, at a considerably worse price.
A pothole answers all of it in an hour, before the answer costs anything. A strike answers it too, at a price that starts at the repair and continues through the outage, the fines, the claim and the schedule.
Measured from finished grade to top of pipe or conduit, at the hole. Not scaled off a drawing and not inferred from a locator readout.
The horizontal offset from whatever you are referencing — centerline, back of curb, property pin. Locate paint has tolerance; an exposed line does not.
Diameter and what it is made of, which is often the detail that decides how a tie-in gets designed.
Photographs of the line as found, with the coating intact, so a later dispute about who damaged what has an answer.
Small, clean-edged, backfilled and compacted. On pavement it takes a patch rather than a repair.
A test hole is a line item. A utility strike is a change order, an outage, a claim and a delay, and none of the four were in the bid.
Nobody has to make a judgement call at the bucket about whether the paint is right. The line is visible.
Potholing at the design stage is how a conflict gets resolved on a drawing instead of in a trench with everybody standing around it.
Depth, offset and a photograph, captured when the line was exposed and undamaged.
Common questions
A locate tells you a line is somewhere under a painted mark, within a tolerance. A pothole is a small excavation that exposes the line so you can measure its actual depth, offset, size and condition. One is an estimate from the surface; the other is a measurement of the thing itself. Design work and bore clearance generally need the second.
Depth is limited by hose length and by what the soil does as the hole gets deeper, not by the method. Typical utility work — potholing, service exposure, bore pits — sits comfortably in the range hydro excavation is built for. Anything unusually deep is worth describing on the phone first so you get a straight answer about whether it suits the method.
Only as big as it needs to be to see and measure the line — typically a small-diameter hole rather than an excavation. It is backfilled and compacted afterwards, and on pavement it takes a patch rather than a full repair, which is most of the cost argument for doing it this way.
It depends what the answer is worth. GPR is a surface reading and its accuracy varies with soil, depth and what else is nearby — in Upstate clay it returns less than it does in sand. If you need to know a line is roughly there, a locate is enough. If a bore path, a design conflict or a tie-in depends on the number, exposing the line is the only way to be certain of it.
That depends on where the work is, what it involves, and what is already scheduled — so rather than publish a number we cannot honor on every job, call and you will get a straight answer about this week.
Tell us where it is and what is in the way. Photographs and a site plan get you a far more accurate number.